it ahaa i BURY aC Tan H pian jyeessels Peek waraged! PA SUA RRM wai reise ba fatale ated Ere ¥: Fs f e Y " 3 : * f pte vad AEC ‘a! ‘* py | 4 ji is a of ) Sir REO a ie moana th BOSE ANAESTH THE CORPORATION OF THE CITY OF PORT COQUITLAM FEB 17 109 MEMORANDUM B.R. Kirk DATE: February 12, 1992 City Administrator FROM: LR. Zahynacz, P. Eng. City Engineer improve 3 ~ 2178 Grant Avene (Public Works/Traffic Committee Meeting of February 11, 1992) | SUBJECT: That a standard catch basin and lead be installed in front of 2178 Grant Avenue at an estimated cost of $3,000. That $3,000 be allocated from the Public Works Special Capital Reserve Fund for this purpose. The Public Works/Traffic Committee considered the attached memorandum from the Project Technician regarding a drainage problem in front of 2178 Grant Avenue. : « In the past, water from the road used to soak away in the boulevard near 2178 Grant Avenue. In 1992, the pavement on Grant Avenue was resurfaced and the shoulder was reconstructed. The water now collects at this location and runs towards the residence. As there is an existing storm sewer on the north side of Grant Avenue, it is recommended that a catch basin be installed in front of 2178 Grant Avenue complete with a 150mm. diameter lead at Valier LR. ZahYyhacz, P/Eng City Engineer IRZ:gc Attachment I verify that there is sufficient funds in the Public Works Special Capital Reserve Fund for this purpose.