COST ESTIMATES Based on ths various portions of the work previously described and the -correspending unit prices and contractor's quotes for the sprinkter system the following cost estimates have been prepared. It should be noted that the following costs inciude approximately 15% for contingencies. |-Weather Soccer Field: Clearing.and Grubbing $ 2,000 Stripping and Subgrade Preparation 3,800 Filling Portion of River Bed 35,700 Placement of Pit-run Gravel 40,300 Placement of |9mm.minus Road Mulch 36,000 Placement of Rock Dust 14,900 TOTAL: $134,700 2. Grass Surfaced Soccer Field: Clearing and: Grubbing oe 2,000 Stripping and Subgrade Preparation . §,800 Filling Portion of River Bed 35,700 Installation of Sub-surface Drains . - 33,600 Placement of, Sand Fill . 69,500 Instatlation of. Sprinkler System: - hs cos (by Contract)... 15,000 Seeding and Fertilizing : 31,700 TOTAL: $193,300. Parking Lot and Access Road: Clearing and Grubbing . , (Included in scccer . a . field estimates) Stripping and Subgrade Preparation : Filling Portion of River Bed Placement of Pit-run Gravel Placement of 19mm Road Mulch TOTAL: As can be seen from the above cost estimates, the filling of a portion of the river bed to fthe-raquired grade represents a relatively large sum. If it is acceptable to-move both the proposed soccer field and parking lot approximately 25 m in the northeasterty direction, the reduced cost estimates for the construction of .the all-weather field, the grassed field, and the parking lot including access road’ are $99,000, $157,600, and $10,800. respectively. 4 18 ai eehithiny Rabminpe nme ne Drennan ean rte Sa eee eta oy atiaa Ld ashi pars s enE NY SE TON Deal see be Pe team wh nSt i MELE ER i RAE