Ba re ; ; tae Tee ted RNC aT PS ayer today RE Hb gehe Mig ee : rive A een aCe: CH he Pibeb aah tg et Serenata eater Or ae . d 4 tee Less ae The cost for a full depth mill and overlay for this section is as follows: Mill and Overlay Full Depth Mill, 1800 m2 @ $5/m2 = 9,000 Asphalt, 300 MT @ $50/tonne = 15,000 Contingencies (15%) =_ 3,000 Total ($) = 27,000 Both these road sections could be considered for the annual road resurfacing program. It should be noted that these road sections would have a lower priority than roads in worse condition (condition 5) and with higher traffic volumes. (Lg. Andrew de Boer Project Engineer 3 ve ry Jed r