The following table summarizes the above noted work. Either the use of the existing controller or the supply and installation of anew controller can be selected. eager eae & Overhead Signals 5 2 500.00 $ 2,500.00 Pedestrian Signals 23,600.00 23,600.00 Vehicle Loops 9,480.00 9,480.00 New Signal Poles | 15,000.00 15,000.00 Upgrade Novax Unit 12,000.00. 0,00 New Econolite Unit 0.00 20,000.00. Street Name Signs 700.00 700.00 Immediate Work (1,2 & 6) 26,800.00 . 26,800.00 Other Work (3, 4 & 5) 36,480.00 44 480.00 Total Work $63,280.00 $71,280.00 5.2. Shaughnessy Street at Pitt River Road This intersection is in reasonable condition with the main exception being the advance flashing GREEN signal for east to northbound traffic. 1.0 Supply and installation of a new eastbound overhead and secondary signal heads with fibre optic arrows, complete with yellow backboards. Estimated Cost: $3,500.00 The overhead and secondary signal heads for the eastbound movement require upgrading to accommodate a fibre optic GREEN and YELLOW arrow signal section. The cost identified» reflects the removal of existing signal heads and the suppl Ly and installation of new signal heads, as well as upgrading the field wiring and traffic controller.