an ¥ tends Me faok yits UN Chin Capital Works In 1991 we increased rates to get capital replacements back on track, unfortunately as revenue projections did not come about funds expected to be available for capital were not available. A significant portion of the rate increase will be aimed at providing funds for capital replacements. Projected works for 1992 and 1993 are shown on. the schedule. User fees Existing flat rate user fees will increase in 1992 from $8.84 per month to $11.25 per month and other rates covered in the bylaw will increase proportionally. The largest portion of the increased rates though is as a result of the anticipated increase in the GVS&DD levy resulting from their Long Range Plan. Senior Citizen rate waiver The budget and rates are calculated on the assumption that the existing waiver will be extended to new rates, at roughly the same percentage as the current waiver provides. The current waiver is 25% of rates arid would be expanded to apply to the increased rates. aa Aa ae rest CONCERNS Our capital reserves in both utilities are being substantially reduced to the point where frankly I would not recommend any further withdrawals from them. Our options are to reduce the capital program or increase rates to restore reserves fo a reasonable level. I have talked with Igor and it is my understanding that the proposed works for 1992/93 are catching up work which should have been done in the past and he does not recommend further delays. Rate increases would reduce the spending from the reserves and if projected rate increases for 1993 are carried through some funds will be added to both reserves in 1993. | The GVRD Long Range Plan will require substantial increases in levies on our taxpayers and this may have an adverse effect on the City as there may be a reluctance to fund City service level increases at the same time that the taxpayer is getting substantial increases on the GVRD portion of the City’s billings.