K SUMMARY OF PROFESSIONAL DESIGN AND FIELD REVIEW REQUIREMENTS To be submitted with Schedule J prior to the issuance of a Building Permit. Date: City of Port Coquitlam Building Department 2580 Shaughnessy Street Port Coquitlam, BC V3C 2A8 ATTE Dear Sirs; RE: Address Owner Building Permit Application No. (the "Project") (Initial applicable discipline) (Cross out and initial non-applicable items) I will be respensible for the design and field review of Following components of the Project: ARCHITECTURAL Fire Resisting Assemblies Fire separations and their continuity Closures, including tightness and operation Interior and exterior finishes . Egress systems, including “Access to Exit", within "suites" and “floor areas" Performance of physical safety features (guardrails, handrails, etc.) Structural capacity of architectural components, including anchorage and seismic restraint Roofing and flashing Wall cladding systems Dampproofing and/or waterproofing of walls and slabs below grade Thermal insulation systems; including condensation control and cavity ventilation Sound insulation systems Landscaping, screening and site grading Provisions for fire fighting access Requirements for persons with disabilities Elevating devices Coordination of testing of fire emergency systems maintenance programs Development Permit and conditions therein Exterior glazing TEM T PAGE AX)