He a1oedy C .s a neath Ran cy RRAEN Dc ao i or heen atyiie ere A fides N.D. Lea Consultants Ltd. 1455 West Georgia Street Vancouver, 8.C,, Canada V6G 2T3 Tel: (604) 685-9381 Telex: 04-55144 Fax: (604) 683-8655 Consulting Engineers « Planners ° Transportation Consultants March 9, 1994. File: 81024.710 Pemers a eae CITY OF Poi: Ae eatal ENGINEERIN« City of Port Coquitlam Engineering Department 2580 Shaughnessy Street Port Coquitlam, B.C. V3C 2A8 Attention: Mr. Igor Zahynacz, P.Eng. City Engineer Dear Mr. Zahynacz: Reference: Port Coquitlam Home Centre Development As discussed at our meeting of March 7, .1994, this letter is to inform you of the status of design and approvals for the roadworks on Shaughnessy Street and Lougheed Highway connected with the above project. We have contacted the various agencies involved in this work and received the following informaticn: 1) Ministry of Transportation and Highways: Approval for the roadworks can be made based on the existing design and should be available early next week. Approval for the electrical work can be made on the present design after revisions are made to specifications reviewed earlier. No timing was available from the MoTH Electrical Department for this approval. MoTH is not concerned with revisions proposed to Shaughnessy Suee. (BC Transit proposal for the tus bay) south of Lougheed and these revisions should not hold up the approval process. The design and cost estimates for relocations of BC Hydro poles on Shaughnessy and Lougheed are underway and should be finalized this week. The construction timing for these relocations isn’t known at this time. The engineering design for roadworks will be completed by the end of this week and drawings sent to BC Transit and The City of Port Coquitlam for approval. The Engineering design for the Electrical revisions will be completed by March 18th. TEM . Lea Associates rr 2) . «