THE CORPORATION OF THE C O UJ C 99 CITY OF PORT COQUITLAM JUL 2349 Kirk DATE: July 19, 1990 Administrator FROM: Zahynacz, P. Eng. i Engineer SUBJECT: WILSON CONNECTOR TO COMO DRIVE RECOMMENDATION: That Council direct staff to prepare terms of reference for Transportation Consultant Services for the development of a conceptual pian for the Wilson Connector. BACKGROUND AND COMMENTS: As shown on the attached plan, the Ministry of Transportation and Highways has identified the need for the Wilson Road Connector which would involve the construction of approximately 1 1/2 km. of road and a bridge over the Coquitlam River. In order for the City to consider design alternatives and financing, it would be necessary to develop conceptual schemes and initial cost estimates of the alternatives. This concept plan could form the basis for discussions with the District of Coquitlam and the Ministry of Transportation and Highways. 2 a yf flee ——~ ce _— I. R. 2@hynaez;-P. Eng. City Engineer IRZige Attachment Te Sree! blr he