Tah ) thy fivkd geet ees 5 CITY OF PORT COQUITLAM ¥ CITY OF PORT COQUITLAM ENGINEERING DEPT. THE, CORPORATION OF THE JAN 13 1892 i TO FROM DATE MEMORANDUM Igor zahynacz, P.Eng. City Engineer Andrew de Boer Project Engineer January 14, 1992 RECOMMENDATION - that Key Bench be awarded the contract for the installation of bus stop benches in the City BACKGROUND On Nevemper 29, 1991 three proposals were submitted re the .ity for the installation of bus stop benches. The thre> companies which submitted were: Key Bench Advertising Goodwill Advertising City Bench Company The proposals were evaluated according to the terms of reference of the proposal ‘see attached) and a recommendation made. EVALUATION The evaluation of the three proposals was made on the five items in the terms of reference. Each company was given a rating from 1 to 5 for the specific item. In addition, percent weightings were given to each item in the proposal. The following table presents an evaluation for the three proponents. Faas Sigg ms Bt,