SENT 3Y*DELCAN CORP ‘ i EDAS259458- DELCAN Mr. Mike Davies, P.Eng. March 4, 1993 Page 2 This estimate is based on our current understanding of the project scope, which includes tha follawing: 1) Design of road upgrade to Port Coquitlarn’s 14 metre arterial standard section, complete with curbs, sidawalks (both sidas), and ornamental streat lighting; 2) Dasign of naw starm sewer systam. We assuma discharge points ara at Mary Hill Road, Shaugnessy Straet or elsewhere within the design araa; 3) Survay pick-up, preparation of base plans, design drawings, specifications and tender documents (NOTE: this work will be inciuded in the overall Kingsway packages including the Westwood to Coquitlam River Section - a separate document will not be required); 4) No design requiremsnts for watermain cr sanitary sawers; 6) Work to be generally in accordance with Dalcan proposal dated January 18, 1993 for Kingsway Avenue between Westwood Street and Coquitlam River. Costs for additional inspection services during construction depend on the extra construction time required. Additional inspection and contract administration costs would ba charged at the unit rates quoted in our proposal for the Westwood/Caquitlam River Saction. We would appraciate your early authorization to proceed with the design work since we Intand to complata the survey required for the Westwood/Coquitlam River section within tha next week. The above astimates are based on simultaneous complation of tha Shaugnessy/Mary Hill Road section, Thank you for the opportunity to propose on theses works. Please call the undersigned if you have any questions or wish to discuss the work, f ( rke, P.Eng.