250mm Storm Sewer CB & Leads Manholes Clearing & Demolition Excavation Sub-base 200mm Base Gravel 75mm Asphalt Asphalt hand work Curb & Gutter Extruded Concrete Curb Concrete Sidewalk Asphalt Cutting Noulevard Restoration Sign Relocation Line hinting Dust Control Street lighting Legal Survey Pole Relecation Design Revisions Miscellaneous Disconnection Fees BC Gas, Telephone, & Hydro Traffic Lights SUB TOTAL Contingencies (5%) TOTAL COST $ 9,076 13,304 3,012 8,185 12,521 19,567 12,825 17,547 12,605 13,513 6,567 12,855 649 25,807 201 1,274 714 4,500 2,000 5,000 8,500 3,000 1,000 65,000 $259,219 _12,961 $273,000