THE CORPORATION OF THE CITY OF PORT COQUITLAM B.R. Kirk February 12, 1992 City Administrator UR. Zahynacz, P. Eng. City Engineer Wramace in re te ~ 1680 Coounitis Committee Meeting of February 11, 1992) (Pu That Council approve the installation of a standard catch basin and the lead in the pe boulevard in front of 1680 Coquitlam Avenue at a cost of $3,500. , That $3,500 be allocated from the Public Works Special Capital Reserve Fund for this purpose. ยข The Public Works/Traffic Committee considered the attached memorandum from the Project Technician describing the drainage problem in front of 1680 Coquitiam Avenue along with alternate solutions for correcting the problem. In the past, rain water runoff was accommodated by a combination of scaking into the ground and draining to an existing catch basin to the eastside of this property. In 1991, the road surface on.Coquitlam Avenue was repaved and the shoulder was reconstructed. The water now ponds and drains towards the residence. | Constructing a swail at this location would result in an uneven surface and future maintenance costs. It is therefore recommended that a catch basin and lead be installed in front of 1680 Coquitlam Avenue. IRZ:gc . Attachments [ verify that there is sufficient funds in the Public Works Special Capital Reserve Fund for this purpose. 7 _ ae aitland, City Treasurer