a aN eg h et eae THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM TOC Public Works Committee DATE: April 23, 1991 FROM: LR. Zahynacz, P. Eng. City Engineer SUBJECT: REQUEST FOR CATCH BASIN - 3863 ROBIN PLACE That a catch basin be installed at the south end of Robin Place at an estimated cost of $2,500. That $2,500 be allocated from the Special Public Works Reserve for this purpose. aivieen ā€˜ ā€˜ BN pied i o 2 . oy ata : " aa Attached is a report from the Engineering Technician dated April 19, 1991 regarding a request from Robert Mora of 3863 Robin Place for the installation of a catch basin. | mv There is a little spot at the south end of Robin Place with no catch basin to collect the water. — Last winter Mr. Mora experienced. flooding in the basement of his home due to run off from Robin Place. - ; 7 a | ae i, een oy it is estimated that it would cost $2,500 to construct a catch basin and a short lead to a storm . sewer which is located nearby. | ne 7 ere LR. OE . City Engineer : IRZ:gĀ¢ | Attachment