OPTIONS (continued) OPTION TWO: (continued) The following items would be involved in this Option: Regulatory Requirement — B.C. Building Code 1. Add exit doors from pool area: ee ens ee ee 2. Fire rated door and fire dampers at Change Room Building’s service room. Regulatory Requiremenrs — B.C. Heaith Act 3. Apron drainage as Part of the new Poo! Apron. Physical and Structural 4, Change Room Building roof inspection done to the standards of the Roofing Contractor’s Association cf British Columbia. Repairs would then be made as required. Repair concrete block wall cracks and provide clip angles at top of concrete block walls. Repair roof beam. Remove and replace deck apron around pool and provide a new fencing system. Repair cracks in pool bottom and Mechanical/Filter Room roof with epoxy injection. Waterproof roof of Mechanical/Filter Room when new pool deck apron is built. Mechanical 10. Provide vents in Change Room Building’s service room. 11. Provide additionai skimmers at the north end of the pool, 12. Investigate the supply and drainage flows of the pool and adjust if necessary. Flectrical 13. Replace all electrical systems in the Change Room Building, Pool apron and Mechanical/Fiiter Room. 14. Provide new main eleetrical service to the pool facility. - 21 16