THE CORPORATION OF THE CITY OF PORT COQUITLAM B.R. Kirk, August 24, 1989 City Administrator I.eM. Chong, P. Eng. , City Engineer Drainage from Hazel Trembath Site ~— Genstar's Request for Release (Public Works Committee Meeting August 22, 1989) 2ecommendation: and Knights Court appr they discovered several drainage outfalls draining onto These outfalls were draining the Hage] Trembath School Site. In Order to prevent damage to their property caused by run-off from these outfalls, Genstar c rsion ditch along the school's south j outfalls. Subsequent to the j version ditch, it was discovered that whenever hea the west boulevard Would be washed out which in tum resulted rocks and other debris being washed down Citadel Drive towards the Pitt River Road intersection. When this problem occurred initially, the cost of clean-up carried out by City crews was captured. In view of the "cause and subsequent effect" resulting from the actions the City decided to Proceed with When Genstar was apprised sis that the problem was originated by the School took place subsequent ly between the City, Genstar, Some improvements were undertaken at the expense of meetings. While the city is for the School Site, we School Board and the Cit this matter,