The Contractor ha piling to this depth in Contract unless the City i iti costs for the sheet Piling. He maintains that this is a design problem and therefore the responsibility of the City. He has quoted a price to compiete the project which jis considered in option (A). The Possibitity of accepting the ‘uneven Profile of the. sewer by changing the Pipe material, size, and type of joint, is considered as option (8B). . AS an’ other two contract to These other Problems and are prepared the prices quoted, The lowest alternatiyv is quoted by H.B. Contracting and this is considered in Option (C). Although ‘this option requires the - termination of our present Contract and a cal| on the Bonding Company to make up the difference between the original contract price and the new contract price, this wilt ifkely result tn a court battle and wit] certainly involve the cost of legal fees. Option (D) and {E) involve a fow Pressure pump system with each Property having an independent smali. pump to PUMP sewage through a smal | dlameter force main.. This main can be laid close to the surface and js not dependent on accurate line or grade and therefore is cheap and easy to install. The system is the same that is used in Mayfair Industrial Park and is an ideal system where sof] conditions are poor. Option (D) ‘involves the Ownership by the City of the individual “grinder Pumps whereas option CE) Involves private ownership. -. The recommendation the grinder pump. - ‘system with private.ow ip of) ps. This option. reduces the Initial fon tially. However, this. optton become hen we talk about extending the sewe industrial Area, extend a gravity sewer System to Coast Meridian Road involves depths aven greater than those along Broadway, With a conventional system we can anticipate very high costs in the future. With the alternative option (E) the future Installation wit] also be simplif fed and much cheaper. e@ options after the You will note that option (E)