The height of the building is approximately 11.75 metres (measured from the natural grade) to the top of the flat roof. Four peaked roof structures which add 1.8 m. to this height are placed at intervals along the roof to add interest to the building elevation. The fourth floor of the building is recessed on all sides to reduce the volumetric impact of the building from the street. COMMENTS FROM OTHER DEPARTMENTS: Engineering Department: 1. Whyte Avenue to be conetructed for full length of the site 1/2 road plua lm. (future width 10.5 m). Install barrier type curb and gutter, with catch basing as required, and concrete sidewalk. Lane to be constructed and paved from EPL of the site to Meple. Storm sewer and catchbasins as required. (Connect to sewer main on Whyte). Ornamental street lighting required on Whyte Avenue. Underground Hydro and Tel services required to site. Minimum habitable floor elevatiun for the site is 8.8 m GSC datum. Development Cost Charges amounting to 55 units at $2780 per unit for $207,900 total are applicable. These figures are calculated at the new D.C.C. rates and a D.C.C. Trust Agreement is required. Building Department: A building code review will be done at the time of builcing permit application. Parks and Recreation Department: 1. Landscape requirement to be approved by the Parks and Recreation Department. 2. Community room for meetings required. R.C.M.P. Lack of a noted security gate on the drawings for the underground parking area. Fire Department: No comments. cont. page 3 PAGE |