-3- Atkins Avenue to be reconstructed 1/2 road plus 1 m (10.5) complete with barrier type curb and gutter and sidewalk for the full frontage of the site. The lane north of Atkins Avenue to be paved for the full length of the site complete with catch basin(s) as required. Sanitary sewer connection to be installed by City at Developers Cost at Building Permit Application. Underground Hydro and Telephone services are required. Development Cost Charges will be applied at Building Permit Application. A DCC Trust Agreement is required. 10. The minimum habitable floor elevation for this site is 7.0 m. GSC datum. Building D . 1. Floodplain elevations are to be confirmed. Plans indicated habitable area on lowest floor. 2. A Building Code review will be done at the time of a Building Permit Application. Landscape plan to be reviewed by Parks and Recreation Department. Fire Department: 1. All comments will be made at plan approval. 2. Check for water supply for construction. R.C.MePes Recommended that visitor parking should be separated from resident parking. DISCUSSION: In order to accommodate the building design, a variance is being requested to relax the interior sideyard setback from 25 ft. to 18'8". As there will be windows to habitable rooms that face into the sideyard, the Planning Department does not support the requested variance. The architect has been advised of this and will be required to revise the building as necessary to conform to Bylaw requirements. : | ITEM PAGE Cont'd... /4 IF