4 Satenited ibe eo MeN ers if Re Te wes}, asia Fakt esl i) sal ite Yo Js pid Three options would alleviate the resident’s drainage problem: Option 1 Swale to existing catch basin at the NE comer of the property. Run off water from the higher road elevation would go to existing catch basin. However, this option would not remedy the drainage problem during periods of heavy rainfall. The result would be a collapsing of the temporary trench and resulting property flooding. | . Cost of swaling : $145.00 (tw ce/year or more) TOTAL = $290(min.) Pave the boulevard to create permanent swale. This option would alleviate the need to re-swale gravel boulevard in future. Cost of asphalt hand work: ~approx.25m - 65mm asphalt @ $200/tonne = $1600 TOTAL $1600 Install a catch basin at the NW comer of the property at 1680 Coquitlam Avenue. Cost of catch basin and lead: ~approx. 13m - 150mm lead @ $102/m = $1350 -CB and barrel | = $1500 contingencies (15%) . $450 — TOTAL $3300 say $3500 rt: ben Yeti ‘Asine T. Pynenbur. Project Technician