THE CORPORATION OF THE CITY OF PORT COQUITLAM C 0 UJ N C MEMORANDUM SEP 19 1993 TO: B. Kirk, September 14, 1983 City Administrator FROM: F.E. Peters., P. Eng., City Engineer SUBJECT: Kingsway Reconstruction Project RECOMMENDATION: That this report be received for information. BACKGROUND ANDO COMMENTS: This. report is the result of Alderman Mabbett's request in Council for further intormation on the reason for the delays during the construction of the Kingsway Project. My previous report, a copy of which is attached, outlined in general terms what | felt were the main reasons for the length of time it took to comptete the project. | have reviewed in detail the work schedules, manhours spent, drys of raintali, etc. for this project and can add very littie to what Il have already expressed. The project commenced with the Installation of storm.sewer on. June 6th. Excavation of the old road did not start..untii, June 13th and sub-base construction took piace concurrently with excavation starting about June |5th. The road. work to the. top of the sub-base was substantially complete by July 7th... We then had six consecutive days of heavy rainfall during which very little ‘work was done other than some rolling and grading at the intersection. During this time we could not get. Benkleman. Beam testing done. The Benkleman Beam testing was done.on, July [8th and the results Sere not available until July 21st. In the meantime we carried on with the construction of the section from Wilson to Tyner which had been added by Council. as.an extension to the project. Once the Benkleman Beam results were back we were able to repair those sections of the sub-base which were weak and then were able to start on. laying the base for the curbing. The curbing contractor could not ..start until. July 28th and did not complete until August 2nd. .After allowing: severat more days for the concrete in the curbs to cure, we were able to then backfill! behind the curb and tay the base course between the curbs. Compaction of this base course was comp!teted by August 10th and paving took place on August I/th.. TCT mt a accel Hes cate tS Cig tt tue mababcantcadgendriipieenete tierra a F renenenen ve anwar tee fn eect , ie Ped tg Uh ua natal ae Ghd a ON eidity led NY seits