He (IONE Of Or Service 19 January 1999 . File: 22 WP ~ Pt. I Property Referral # LOM 337 Your File: V31M Associated Engineering (B.C.) Ltd. 4940 Canada Way Burnaby, B.C. VSG 4M5 Attention: S. Gunadasa, P.Eng. Near Sirs Re: — Proposed Coquitlam River Dyking - Contract Ho. 1 - Dyke Construction crossing Bury Avenue, Port Coquitlam within B.C. Hydro Right of way AB203569, Assignment of Y113122 (hereinafter referred to as the "right of way") - Lot 2 of D.L. 379, Gp. 1, N.W.D.. Plan 68311 n of the City of Port Coquitia i “Corporation") agreeing to the following conditions: 1. The Corporation shall not d unless caused solely b or agents. Claims and demands whatsoever arising t of or connected with the encroachment ctrical effects created by induction and mB. C. Hydro's transmission line and, i estricting the generality of the foregoing, O against and from any claim made by the whomsoever in respect of or arising out of ment. British Columbia Hydroand Power Authority dtEM 93 G A eet, Vancouver B.C. Canada V6Z_ 1Y3 Fax 663-2159 L\