THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM TO: Mayor and Aldermen FROM: Special Council Committee Kilmer House SUBJECT: Kilmer House erm See comin mee mk me Smee ear ate WY Om cle Cenk ems RD SOY Ade END oR WON AEF GUC CD UTD CA eke PD FY GoD me nm orm COO MEK mtRE ORY thio Whmy OND HGH (TOR MELOD WARY “nds 1M IIT OOF? Sereh SLO WOE GEL EMSS EH! SRD 6 rm Kine ume OnE MU Lows) Cuts cont MEDD CES WD ee toe wee ales sexe aia ena RECOMMENDATION: THAT the Kilmer Residence Heritage Restoration report as prepared by Toby, Russell, Buckwell & Partners be received; AND THAT the Municipal Council give the Committee further direction. Background and Comments: The report by Toby Russell Buckwell identifies each interior Space, provides a deseription of the renovations and related costs for each space by way of Architectural components i.e. floor, base wall, ceiling, doors, windows, millwork; structural components as required. Estimated cost of construction $227,000.00*% Professional services (design detail), construction documentation and construction administration). $ 21,500.00 $248,500.09 Total cost say $250,000.00 *This figure includes a contingency of 8%-9% Attachments: I Correspondence from Toby, Russell, Buckwell under date of November 30, 1988. If Kilmer Residence Heritage Restoration Report. The City Treasurer has advised that two grants are available towards the cost of the project: I B.C. Heritage Trust - grants are available on a 50/50 basis to a maximum of $50,000.00 for "exterior renovsations” only. B.C. Lottery Fund = grants are available for up to 1/3 of the cost of the total project. Z