. etl ; ahh fe , TARAS ae weedy fared i yagi cena AZ THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM B.R. Kirk DATE: May 29, 199} City Administrator APPROVED LR. Zahynacz, P. Eng. City Engineer BY EOUNG OM Lo r] Ite RA RHE NC i * (i } SH anit CLERK BY i ~ en _ , | ee . That the City of Port Coq. ‘m approve the installation of 92 metres cf 250mm diameter a storm sewer on Patricia be = ¢n Sefton & Coast Meridian, plus a cateh basin on Sefton at an estimated cost of $20, That $20,000 be allocated frou: the Special Public Works Capital Reserve. The Public Works Committee considered the attached memorandum from the Engineering Technician regarding a request from Mr. Ken McLellan for drainage improvements in front of 3580 Sefton. It is proposed to install 92 metres of 250mm diameter storm sewer main on Patricia from Sefton to Coast Meridian Road complete with a catch basin in front of 3580 Sefton Street. The proposed storm sewer would not only solve the drainage probiem in front of 3580 Sefton, but could be extended in the future to drain other parts of Patricia and Sefton. 1 +t EP 6 P RR Zahynacz, P. Eng _ City Emgineer IRZ:g¢ Attachments Ny CIT TRere Cs BUCK REA AA ‘ds in the Special Public Works Capital Reserve Account for this purpose. ENGINESRING DEPT. ~ yf (Maitland, City Treasurer