ain ci arid THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM MEMO TO: Igor Zahynacz, P. Eng. DATE: July 17, 1992 City Engineer MEMO FROM: Steve Brown Assistant Operations Mgr. SUBJECT: Drainage Problem at 1938 Connaught ee oe mm am ma mL 4m mw oh tO BF ht Oot OOo oy ok tm ets ey 04mg exw na en ew Our Utilities Department recently received a complaint from Mr. Nath Mehra resident of 1938 Connaught, requesting the City fix a drainage problem adjacent to his property. A five meter by fifteen meter section of boulevard next to the curb in his front yard is saturated and extremely soft. From the stains on the curb it appears there has been a drainage problem in this area for some time. My understanding is that approximately eight years ago our Utilities Deparment installed some type of drain as a result of a similar drainage problem. It is recommended that a perforated drain field be installed, as per the attached sketch at an estimated cost of $4,407. Please forward this request to the Public Works Committee for their review and approval. Enclosed is a photograph, an estimate and a drainage sketch. Sincerely, aon Steve Brown cc Gordon Voncina SB/AL connaugh