THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM TO: B. Kirk, City Administrator FROM: FE. Peters., P, Eng., City Engineer COUN SEP 19 1983 September 15, 1983 SUBJECT: Paving of Area in front of Second Step Soclety Public Works Committee, September 12th ,1983 RECOMMENDATION: That the gravel parking area jn front of the Second Step Societ+ BACKGROUND AND COMMENTS: that the estimated nds in the Public . The Parking area in front of the Second Step Soclety building is-grayvel and does not remain in a smooth condition for very “long after grading. The development of depressions and water ponding on this area creates a diffteutty for the handicapped when attempting to access the building, A request was received from the Second Step Society to have us surface treat the area in the same way that we did the Shoulder of Kingsway. mmittee has viewed this area and is justified, uce the best However, the use of flush surface for wheelchairs nor tical to do a small area like This. Our cost of surfacing the materlal with an asphalt Overlay is about $1600. The funds are available in the Public Works unallocated’ budget and the Committee recommends that this work be done this year. ee eT Pe eae “La ~ FE. Peters., P, Eng., City Engineer MMOS ham alii et Ad Sag tre enero Ae ana era NS Ne NBA MAO LP ete, a rte yen neste orn SINTER Hmm te et tne spon phoma ases ayer antennae rate ee AWS ee ene annette