THE CORPORATION OF THE C 0 UJ N C CITY OF PORT COQUITLAM aes NOV 3- 1986 MEMORANDUM TO: City Administrator October 30, 1986 FROM: City Engineer SUBJECT: Contract for Water and Sewer on Broadway Street - Public Works Committee October 30, 1986 Recommendation: "That the Engineer be ed with. option (E) as described on the attac rt conventional industrial Background and Comments: The following attachments are included for consideration with this report: 1. 2A description of five Possible options for completion of the sanitary sewer project. 2. A comparison of those options listing advantages ‘and disadvantages of each. A table comparing the costs for these options, both inftiatly and over the long run including maintenance.: Informational materia! on the grinder pump system. lower than the a great deal of difficult pped a number of times for As a result of a recent “problem tn correct grade we have determined + lem is that the soil at the bottom o is llfting during excavation and fs resettiing after the pipe has been laid. With the use of conventional! shoring It is not Possible to correct this Problem. A Soils Consultant has indicated the need for sheet piling to be extended below the depth of the trench prior to excavation to prevent this problem.